9/24 A Tougher Trail

 

IMG_1324

It’s been rough the past few weeks. Unlike the creatures that live in this forest, I’m not well adapted to coping with the three H’s – Heat, Humidity, and Hordes of mosquitos. But after my first trail building adventure, I felt empowered to take on another much needed reroute. This one turned out to be considerably more of a challenge. Steep terrain, invasive plants, drainage problems, and miserable working conditions all conspired to make it harder than expected. And as more and more soil was gouged out of the trailbed by heavy rains, it was apparent the trail needed to be moved soon.

IMG_1328

As you can see in the opening pic, the front entry trail below the LNC parking lot plunges down a steep hill. Various routes have been attempted over the years to convey hikers to the base of the hill, all of which have resulted in considerable erosion damage. This summer’s torrential rains speeded the process, to the point where the trail was becoming unsafe. The pic above illustrates it well; the right half of the trailbed at this spot was taken out by heavy stormwater flows over just a few hour period.

IMG_1326

The route had been repaired over the years, most recently by an Eagle Scout project that involved wood steps and embedded stones to funnel water out of the trailbed. However, the underlying reality could not be fixed – the trail descended the slope too steeply, ensuring it would inevitably become a channel for stormwater. Finding a better route proved difficult, as the entire hillside presented one hidden issue after another.

As with many things, designing trails becomes more than just that. It’s allowing me to see the entire landscape differently. My hilly neighborhood reveals its once forested slopes and swales, and I’m glad I was never tempted to own a house built in a former stream course. Now I notice every dysfunctional drainage pattern inflicted on the local terrain, and it’s not a pretty sight.

IMG_1335

But sometimes the damage is quite hidden, as with the site where I needed to find a new trail route. In the pic above, a dense cover of the invasive vine Wintercreeper, Euonymus fortunei, carpets the slope (the seeds no doubt brought by birds from vines on neighborhood trees). After working on this hillside, I can say with surety that Wintercreeper is very ineffective for erosion control on slopes – its shallow root system merely masks underlying drainage issues.

IMG_1339

In this case the slope is being hollowed out by stormwater flows moving below the surface. The paved parking area perched at the top of the hill provides heavier than normal runoff, making for a labyrinth of channels that cave in under a footstep. Not a promising site for a trail route, but one had to be found.

IMG_1334

Wintercreeper removal was the first step, using foliar sprays of  herbicide followed by handpulling and whacking with a fire rake – a wonderfully effective tool for heavy weeding consisting of four big sharp teeth attached to a handle. (If you’re trying to eradicate this vine without herbicides – good luck. I have tried for years, and evey tiny bit of root left in the ground quickly regrows.)

IMG_1372

The piles of dead vines came in handy for defining the trail edge.

IMG_1349

Much meandering about was required to design a trail to descend this short, but steep slope. Complicating matters was the presence of a natural drainage swale right down the middle, as well as one wall of a deer exclusion area that I didn’t want to tear down.

IMG_1336

After Wintercreeper removal, slope regrading, and annual rye planting the trail is beginning to take shape.

IMG_1352

Switchbacks were used liberally to reduce the steepness of the grade, and allow water drainage off the edges.

IMG_1333

By nice coincidence, the Master Gardeners had to remove some big clumps of River Oats, Chasmanthium latifolium, which they donated to me. These were planted in the moister parts of the swale.

IMG_1351

The earliest trail route down this slope was a set of railroad tie steps from top to bottom. The edges of several ties are visible in the pic above, where the new trail crosses them. Such constructed “improvements” have convinced me that unless absolutely necessary, wooden water bars and steps should not be used in trails. They tend to substitute for good design and drainage, and ultimately cause more problems. In this case, the steps proved a barrier to drainage, and erosion channels developed on both sides that are seriously undermining the slope.  The trail had to cross them, so I made water diversion channels to try and keep the water draining aboveground.

What’s even harder than rerouting a trail, is trying to help the old trailbed recover so it will cease to be a stormwater channel. That’s a subject for future posts.

IMG_1363

In other forest news, the hillsides in September are a fluffy sea of White Snakeroot, Ageratina altissima...

IMG_1360

…with Monarchs and other butterflies nectaring in the blooms. I’ve never seen Monarch butterflies regularly flitting through the forest till this year.

IMG_1307

IMG_1311

This Question Mark, Polygonia interrogationis, was slowly flexing its wings as it hung from a leaf. They seldom nectar on flowers, but do like rotting fruit, tree sap, dung and carrion.

 

 

 

 

 

 

 

 

 

 

 

 

 

 

IMG_1324

9 thoughts on “9/24 A Tougher Trail

    1. oneforestfragment

      Reading about trail construction, studying mountain bike trails, and trial and error – especially error! The first good rainfall on a new trail tells you right away where the problems are. My odd combination of visual artist and former long distance trail hiker seem to have given me the basic skills. I also have an inablility to sit still for long. It’s likely I’ll have some youth volunteer help for the next reroutes since they are longer.

      Liked by 1 person

  1. shoreacres

    This is quite interesting. I’ve never done this kind of work, and never really considered what’s required in designing and maintaining a trail. On the other hand, I can recognize a good trail, and appreciate the work of groups who keep them open and usable.

    I smiled to see the Ageratina. We have A. altissima on the Gulf coast, too, and in our hill country A. havanensis is common. They’re certainly great butterfly magnets.

    Liked by 1 person

    1. oneforestfragment

      I’m kind of the opposite – trails that are in bad shape always get my attention, but I tend to take the good ones for granted! The poisonous foliage of Ageratina ensures that deer rarely touch it, so it’s particularly abundant in this forest.

      Liked by 1 person

  2. tonytomeo

    The conference center where I work part time has someone dedicated specifically for the roads, bridges and trails. He is very busy in the very steep terrain! The rainy season here is brief, but very generous.

    Liked by 1 person

    1. oneforestfragment

      This forest has never had a dedicated ‘”trail crew” and the neglect is really showing! The terrain here ranges form steep slopes to bottomland flooplain. Almost all the trails are in some state of degradation, mostly due to channeling water whenever it rains – which is every few days this year.

      Liked by 1 person

      1. tonytomeo

        Even a dedicated crew would have difficulty cleaning up after such regular rain. I know that here, rain is what makes most of the mess. We do not get much, but it is a mess when it happens.

        Like

Leave a comment